R I C H A R D    P E D L A R    A R C H I T E C T S
S
        A R C H I T E C T U R E         •         C O N S E R V A T I O N         •         U R B A N    D E S I G N


Feasibility Studies

     

Proposal for special need housing, St Lukes, Barton Hill, Bristol

From left, perspective sketch and 1:200 ground floor plan.

 

 

 
 

Baptist Church, Reedley Road, Westbury on Trym, Bristol

Feasibility study to provide disabled access, develop the whole site by landscape design, and bring together the sacred and the secular in the creation of a new entrance foyer.

From left, front view of proposed entrance area and landscaping plan.

 

 

 
 

St. Luke's Church, Wellsway, Bath

Feasibility study for the reordering and development of the church, forming new entrance foyer to link the church and church buildings.

From left, site plan and ground floor plan.

 

 

 

 
 

Chaffcombe Depot and Wyvern Waste Transfer Station, near Chard, Somerset

Feasibility study to identify future uses for the buildings on this site on behalf of South Somerset District Council.

From left, part of the site analysis and a view across the reservoir.

 

 

 

 
 

St. Andrew’s Methodist Church, Filton, Bristol

Feasibility study and planning application - working with church groups to identify options for development, reordering and proposed use of After Care accommodation for young people from aged 16 years. 7 no. flats to be constructed over the existing Church Youth Club within the care of St. Andrews Methodist Church and the curtilage of the Methodist Church site. Local resistance to proposed use led to the scheme being aborted.

From left, proposed scheme and site as existing.

 
 
 

The Clifton Observatory, Clifton, Bristol

A feasibility study for Bristol City Council to investigate the history and background of the existing buildings and the potential for redevelopment in an alternative viable use.

From left, section through the building and a location plan.

 
 
 

New Brunswick United Reformed Church, Southmead, Bristol

Feasibility study showing the potential future use of the site and buildings.

From left, site plan and building as existing.

 
 

The Rope Works, West Coker, Somerset

A feasibility study prepared on behalf of the Industrial Preservation Trust in conjunction with South Somerset District Council to investigate the potential for the restoration of the former twine works and a plan for a viable new use.


From left, photograph of existing interior and a proposed site plan.

 
     

Warmley Brass Works and 18th Century Gardens, Bristol,

A proposal for a feasibility study for Kingswood District Council to include an analysis of the existing buildings and reuse of the buildings as a museum and resource centre.

Left, photograph of the brassworks and a location plan.

     

4 Grove Road, Redland, Bristol BS6 6UJ • Tel: 0117 9742612 • Email: info@rpca.co.uk